
VSD – Timing ECO (engineering change order) webinar
VSD – Timing ECO (engineering change order) webinar, available at $44.99, has an average rating of 4.5, with 13 lectures, based on 179 reviews, and has 1027 subscribers.
You will learn about Design better chips Analyze designs, from power, performance and area perspective, altogether This course is ideal for individuals who are Anyone who wants to understand timing ECO strategies and how it impacts overall chip PPA (power, performance, area) or Anyone who wants to be called as "Signoff Timing Expert", rather than, "Signoff Timing Engineer" It is particularly useful for Anyone who wants to understand timing ECO strategies and how it impacts overall chip PPA (power, performance, area) or Anyone who wants to be called as "Signoff Timing Expert", rather than, "Signoff Timing Engineer".
Enroll now: VSD – Timing ECO (engineering change order) webinar
Summary
Title: VSD – Timing ECO (engineering change order) webinar
Price: $44.99
Average Rating: 4.5
Number of Lectures: 13
Number of Published Lectures: 13
Number of Curriculum Items: 13
Number of Published Curriculum Objects: 13
Original Price: $84.99
Quality Status: approved
Status: Live
What You Will Learn
- Design better chips
- Analyze designs, from power, performance and area perspective, altogether
Who Should Attend
- Anyone who wants to understand timing ECO strategies and how it impacts overall chip PPA (power, performance, area)
- Anyone who wants to be called as "Signoff Timing Expert", rather than, "Signoff Timing Engineer"
Target Audiences
- Anyone who wants to understand timing ECO strategies and how it impacts overall chip PPA (power, performance, area)
- Anyone who wants to be called as "Signoff Timing Expert", rather than, "Signoff Timing Engineer"
First, let’s define better? Better in terms of Power. Performance and Area
Every VLSI engineer, an RTL architect, or Lead Synthesis Engineer, or Senior Physical Designer, or Director of Signoff timing analysis – practically everyone is doing timing ECO at every step of their flow. I, being a part of Signoff timing analysis and Physical Design world, am doing ECO almost every day, and so I understood that its more than adding buffer and up-sizing/downsizing cells.
All of the factors or ways shown in above image impacts either dynamic power or short-circuit power or leakage power. The question is, do you know why do we still do it? Do you know how can we still do with minimally impact on other parameters? Yes, No, Don’t Know….
It’s time to unveil more than 9 strategies to do timing ECO and below are few of them�
- Routing congestion aware timing ECO
- Path based analysis ECO for selected endpoints
- Replicated modules based timing ECO
- Legalized timing ECO
- Margin based timing ECO
…..and many more…
See, I told you, timing ECO is more than just adding buffers and sizing cells…Do you want to know all the strategies?
Do you want to be a better timing engineer? Engineering includes tons of changes and modifications from inception to final product. Hence its called Engineering Change Order (ECO)
Welcome all of you to my “Timing ECO webinar”, which was conducted along with ~50people on 6th Jan, 2018. Join and re-live the webinar.�
Course Curriculum
Chapter 1: Introduction
Lecture 1: Introduction
Chapter 2: Power, performance and area
Lecture 1: Factors impacting dynamic and short-circuit power
Lecture 2: Factors impacting short-circuit and leakage power
Lecture 3: Impact of add_buffer and sizing on performance and area
Lecture 4: Impact of load and Vt swap on performance and area
Chapter 3: ECO Strategies – Margin based and slack based fixing for selective end points
Lecture 1: Margin based DRV and setup-hold fixing
Lecture 2: Selective end-point based fixing with margin and slack range
Lecture 3: Slack based and number of path based fixing
Chapter 4: PBA fixing and leakage ECO
Lecture 1: PBA (path-based analysis) based and reg2reg based fixing
Lecture 2: Leakage recovery ECO strategy
Chapter 5: Hierarchical and Physical aware ECO
Lecture 1: Hierarchical ECO with top only hierarchical only and full chip ECO strategy
Lecture 2: Physical aware ECO
Chapter 6: Conclusion
Lecture 1: Bottle-neck analysis and conclusion
Instructors
-
Kunal Ghosh
Digital and Sign-off expert at VLSI System Design(VSD)
Rating Distribution
- 1 stars: 3 votes
- 2 stars: 2 votes
- 3 stars: 27 votes
- 4 stars: 71 votes
- 5 stars: 76 votes
Frequently Asked Questions
How long do I have access to the course materials?
You can view and review the lecture materials indefinitely, like an on-demand channel.
Can I take my courses with me wherever I go?
Definitely! If you have an internet connection, courses on Udemy are available on any device at any time. If you don’t have an internet connection, some instructors also let their students download course lectures. That’s up to the instructor though, so make sure you get on their good side!
You may also like
- Best Video Editing Courses to Learn in March 2025
- Best Music Production Courses to Learn in March 2025
- Best Animation Courses to Learn in March 2025
- Best Digital Illustration Courses to Learn in March 2025
- Best Renewable Energy Courses to Learn in March 2025
- Best Sustainable Living Courses to Learn in March 2025
- Best Ethical AI Courses to Learn in March 2025
- Best Cybersecurity Fundamentals Courses to Learn in March 2025
- Best Smart Home Technology Courses to Learn in March 2025
- Best Holistic Health Courses to Learn in March 2025
- Best Nutrition And Diet Planning Courses to Learn in March 2025
- Best Yoga Instruction Courses to Learn in March 2025
- Best Stress Management Courses to Learn in March 2025
- Best Mindfulness Meditation Courses to Learn in March 2025
- Best Life Coaching Courses to Learn in March 2025
- Best Career Development Courses to Learn in March 2025
- Best Relationship Building Courses to Learn in March 2025
- Best Parenting Skills Courses to Learn in March 2025
- Best Home Improvement Courses to Learn in March 2025
- Best Gardening Courses to Learn in March 2025